Reference

Pavement distress types, and how IRC rates them

IRC:82 names the distresses a bituminous surface shows and rates a road by how much of each it has. The current edition, IRC:82-2023, is not public. The 2015 edition is, and everything below is from it unless another document is named.

Edition

Only the 2015 edition can be read

IRC’s list of publications of 28 September 2026 gives IRC:82-2023 (Second Revision) as the current edition. IRC sells it with a software CD, and its text is not public. The last public edition is IRC:82-2015 (First Revision), posted by Public.Resource.Org without its CD.

Whether the 2023 edition keeps the 2015 tables, weightages or severity limits is not known, so this page does not say what it contains. A contract that names IRC:82-2015, as MoRTH’s 2026 model concession agreement does, is read against the 2015 text.

A file labelled IRC:82-2023 on two public archives is a different code, IRC:139-2024 on multimodal passenger terminals. Check the title page of any copy before quoting it.

Types of distress

20 types in four groups

Section 7 of IRC:82-2015 gives each type its symptoms, location, causes, severity and treatment. These are its clause headings, with a short quote of each symptom. Severity is defined for 10 of them; the rest say “Not applicable”.

Surface defects · 4

7.2.1Bleeding or Fatty Surface
“A surface having a thin film of excess or free bituminous binder on it, which creates a shiny, glass like reflecting surface”
Severity · By area: low below 1% (isolated spots under 5 m² in a lane km), medium 1 to 5%, high extensive, with shoving starting
7.2.2Smooth Surface
“A smooth surface has a low skid resistance and becomes very slippery when it is wet.”
Severity · By skid number: low 30 to 40, high below 30
7.2.3Streaking
“appearance of alternate lean and heavy lines of bitumen either in longitudinal direction or a transverse direction”
7.2.4Hungry Surface
“loss of fine aggregates from the surface or the appearance of dry surface with fine cracks”

Cracks · 6

7.3.2Hairline Cracks
“present in narrow area and their width is less than one mm”
7.3.3Alligator and Map Cracking
“a series of interconnected cracks, having small irregular blocks in pavement surface which resemble the skin of an alligator”
Severity · By crack depth and width: low 1 to 3 mm, medium 3 to 6 mm, high more than 6 mm
7.3.4Longitudinal Cracking
“Cracks that appear parallel to the centerline or along the road”
Severity · By crack width: low 1 to 3 mm and infrequent, medium 3 to 6 mm, high over 6 mm and frequent
7.3.5Transverse Cracks
“appear in the transverse directions or as interconnected cracks forming series of large blocks perpendicular to the direction of the road”
Severity · By crack width, as for longitudinal cracking: 1 to 3, 3 to 6, over 6 mm
7.3.6Edge Cracking
“cracks which develop parallel to outer edge of the pavement”
Severity · By length: low with no break-up or loss of material, medium up to 10% of the affected length, high more than 10%
7.3.7Reflection Cracking
“sympathetic cracks that appear in the bituminous surfacing over joints and underneath cracked pavement”

Deformation · 6

7.4.1Slippage
“relative movement between the wearing course and the layer beneath”
Severity · By extent: low at isolated locations in a lane, high along the wheel path in the entire lane or carriageway
7.4.2Rutting
“longitudinal depression or groove in the pavement along the wheel path”
Severity · By depth: low 4 to 10 mm, high more than 10 mm
7.4.3Corrugation
“formation of regular undulations (ripples) across the bituminous surface”
7.4.4Shoving
“a form of plastic movement within the bituminous layers resulting in bulging of the pavement surface”
7.4.5Shallow Depression
“isolated low areas of limited size, dipping about 25 mm or more below the profile”
7.4.6Settlements and Upheaval
“relatively large deformations of the pavement compared to shallow depressions”

Disintegration · 4

7.5.1Stripping
“separation of bitumen film from the surfaces of the aggregate particles, due to the presence of moisture”
7.5.2Ravelling
“progressive separation and dissociation of fine aggregate particles and binder from the bituminous surface”
Severity · Descriptive: from some loss of fines (low) to a surface too rough, with loss of aggregates (high)
7.5.3Potholes
“bowl shaped cavities of varying sizes in a bituminous surface or extending into the binder/ base course, caused by localized disintegration of material”
Severity · By size: small 25 mm deep and 200 mm wide; medium 25 to 50 mm deep and 500 mm wide; large over 50 mm deep and 500 mm wide
7.5.4Edge-Breaking
“the edge of the bituminous surface gets broken in an irregular way”

The summary in clause 7.1 also names shrinkage cracks and loss of aggregates, which have no clauses of their own; transverse cracks do. “Block cracking” is a term from MoRTH’s 2004 maintenance guidelines, not an IRC:82-2015 clause.

IRC:82-2015 Table 5.1

A rating from 1, Poor, to 3, Good

Clause 5.1: “The rating of pavement may be assigned as per criteria given in Tables 5.1 to 5.3 for different categories of roads.” Each quantity is rated on its own. Higher is better.

The quantities are recorded “kilometer wise”, by a visual survey (Appendix 1, Proforma 1) or by measurement in representative sections (Appendix 2, Proforma 2). Appendix 1 asks for an “individual percentage for each km length”. The code does not say what the percentage is of, so a report should state its own base: carriageway area, lane area or length.

Proforma 1 also records bleeding and edge breaking. None of the three tables rates them.

Table 5.1 · Pavement Distress Based Rating for Highways
IRC:82-2015 Table 5.1, range of distress for each rating band, as printed
DefectPoor1Fair1.1 - 2Good2.1 - 3
Cracking (%)>105 to 10<5
Ravelling (%)>101 to 10<1
Potholes (%)>10.1 to 1<0.1
Shoving (%)>10.1 to 1<0.1
Patching (%)>101 to 10<1
Settlement and Depression (%)>51 to 5< 1
Rut depth (mm) using 3 m straight edge>105 to 10<5
Table 5.2 · MDRs and rural roads
IRC:82-2015 Table 5.2, Pavement Distress Based Rating for MDR(s) and Rural Roads (ODR and VR), as printed
DefectPoorFairGood
Cracking (%)>2010-20< 10
Ravelling (%)>2010-20<10
Pothole (%)>10.5 to 1<0.5
Patching (%)>205-20<5
Settlement and depression (%)>52 to 5<2
Table 5.3 · Urban roads
IRC:82-2015 Table 5.3, Pavement Distress Based Rating for Urban Roads, as printed
DefectPoorFairGood
Cracking %>155-15<5
Ravelling %>105 to 10<5
Potholes %>0.5>0 and ≤0.5NIL (0)
Settlement %>51-5<1
Rut depth (mm) using 3 m straight edge>105-10<5

Table 5.2 drops shoving and rut depth; Table 5.3 drops shoving and patching. The bands differ too: cracking is Poor above 10% on a highway, above 20% on a rural road and above 15% on an urban road.

Appendix 4

Combining the ratings: the worked example, as printed

Appendix 4 gives each quantity a fixed weightage, multiplies, and says: “The Final Rating Value is calculated by taking the average of the Weighted Rating Values of all parameters”. Its example for a highway:

Calculation of Final Rating Values based on quantity (%) of distress
IRC:82-2015 Appendix 4 worked example for a highway, as printed
Distress typeInputRatingWeightageWeighted
Cracking (%)9.001.21.001.2
Ravelling (%)8.001.20.750.9
Potholes (%)0.003.00.501.5
Shoving (%)0.092.11.002.1
Patching (%)5.001.50.751.1
Settlements (%)4.001.20.750.9
Rut Depth (%) [sic]9.001.31.001.3
Final Rating Value · Condition1.3 · Fair

Our arithmetic on the printed method

  • The weighted values sum to 9.0. Divided by the 7 parameters that is 1.29, the printed 1.3. Divided by the weightages’ sum, 5.75, it would be 1.57. So the code takes a plain mean, not a weighted average.
  • On that method a highway rated 3 on every quantity scores 2.46, and one at the floor of Good on every quantity scores 1.73, which is Fair.
  • How a percentage becomes a decimal rating inside a band is not stated. It lives in the code’s Excel utility, on the CD the public copy lacks, which may also compute the final value differently.

The example labels rut depth “(%)” [sic]; Table 5.1 measures it in millimetres under a 3 m straight edge.

What the rating triggers: preventive maintenance “before pavement rating drops to 2” (cl. 5.3), and Table 9.1 suggests periodic renewal at a rating of 2 on national highways, state highways and urban roads, and 2 to 1 on MDRs and rural roads.

“PCI as per IRC”

Where a condition score is used, and what it means

Indian documents score pavement condition on at least three scales. Only one is IRC’s, and none defines a Pavement Condition Index.

Condition scores in Indian documents: name, scale, how far each is defined, and what it is used for
DocumentScoreScaleDefined byUsed for
IRC:82-2015Pavement Distress Based Rating; Final Rating Value1 Poor to 3 GoodBands in Tables 5.1–5.3; weightages and a worked example in Appendix 4. "Pavement condition index" appears once (cl. 9.3), undefinedMaintenance planning and priority
MoRTH model concession agreements (2020, July 2026); an NHAI EPC agreement (2023)Pavement Condition IndexDesirable 3, Acceptable 2.1Not defined. The reference column says IRC:82-2015A concessionaire’s maintenance obligation, inspected “Bi-Annually”
MoRTH Guidelines for Maintenance Management (2004)Pavement condition rating1 Very Poor to 5 Very GoodBands per defect; no rule for combining themMaintenance management
NHIDCL NSV output format (2024)Visual condition, per distress and lane1 Very Poor to 5 Very GoodBands per distress; no compositeNSV survey deliverable

The agreements’ 3 and 2.1 are the top and the floor of IRC:82-2015’s Good band. That the contract index is the IRC:82 rating is our reading of the reference column; the agreements do not say so. Read as Appendix 4’s Final Rating Value, a desirable 3 could not be reached (2.46 at best), so the two do not simply reconcile. Ask the Authority’s or Independent Engineer how the contract computes it.

The 3 / 2.1 figures are a concessionaire’s maintenance obligation, inspected “Bi-Annually” with 180 days to rectify. They are not a survey or DPR standard.

ASTM D6433 defines a Pavement Condition Index for roads and parking lots, developed by the US Army Corps of Engineers. It is a US standard, sold by ASTM. A score from ASTM’s method, its deduct values, or a “PCI below 50” threshold are not IRC’s.

Where Playcraft fits

What recorded video can measure in Table 5.1

Table 5.1 rates a highway on seven quantities. Our shipped build, Playcraft Distress, detects alligator cracking and potholes, so it reaches two of them, cracking only in part. More classes are a model we build on demand, and rut depth we do not offer.

Each IRC:82-2015 Table 5.1 quantity, what the shipped Playcraft Distress build detects for it, and what is built on demand
Table 5.1 quantityPlaycraft Distress (shipped)Built on demand
Cracking (%)Alligator cracking onlyLongitudinal cracking
Ravelling (%)Not detectedRavelling
Potholes (%)Potholes, by area; depth is not measuredIn the shipped build
Shoving (%)Not detectedNot in the nine-class model
Patching (%)Not detectedPatches
Settlement and Depression (%)Not detectedNot in the nine-class model
Rut depth (mm) using 3 m straight edgeNot detectedNot offered: requires a transverse laser or calibrated stereo rig

Percentages. The shipped build reports, for each stretch of continuous distress, the share of lane surface affected, with the lane width as a setting. Table 5.1’s percentages have no stated base, so turning either into its ratings is a scoring step we build on demand, to the base your contract or format names.

Beyond Table 5.1. The on-demand prototype was also trained on bleeding (cl. 7.2.1, recorded in Proforma 1 but not rated in Tables 5.1–5.3). It has labels for transverse cracking, corrugation (7.4.3) and what it calls swell, IRC’s upheaval (7.4.6), but its training images held 0, 3 and 0 examples of them, so it does not detect them yet. Smooth surface is set by skid number and rut depth by a 3 m straight edge: neither comes from a forward camera. For roughness, see road roughness as per IRC.

Accuracy. We have not published an accuracy figure for either model. Send us footage and judge the output yourself. See also the NSV survey.

Sources

Next step

See it run on a call

  • The tool running on footage you choose, or ours
  • Every output file opened and explained
  • A plain answer on fit before commercials